Home     /     Blog
By Sofier

Erosion control mat installation depends on contact with the prepared surface and the accepted anchorage. 3D vegetation geomats should be placed.

By Sofier

Geogrid installation needs the correct orientation and continuity before aggregate is placed. PP biaxial geogrids should follow the accepted project.

By Sofier

Geotextile tube filling should follow the selected product’s approved operating procedure. PP woven geotextile tubes need controlled connections.

  • Explore Geosynthetic Solutions

    Join Suneco New Material Newsletter for product information on drainage, erosion control, reinforcement and landscaping.

  • Subscribe to Our Blog

    We will never rent or sell your email to anyone.

  • Find Geosynthetic Products for Your Project

    • HDPE Dimple Drainage Boards
    • PP Biaxial Geogrids
    • Air Pruning Plant Pots

    Contact Us Now