Erosion control mat installation depends on contact with the prepared surface and the accepted anchorage. 3D vegetation geomats should be placed.
Geogrid installation needs the correct orientation and continuity before aggregate is placed. PP biaxial geogrids should follow the accepted project.
Geotextile tube filling should follow the selected product’s approved operating procedure. PP woven geotextile tubes need controlled connections.

By Sofier


